Comelit Security 40797 Instruções de Operação Página 42

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 41
36
4.2 Preventive Maintenance
Following the preventive maintenance schedule allows detection and
correction of minor faults before they become serious and cause
equipment failure.
Periodically perform the following:
1. Inspect all connecting cables for deterioration or other damage.
2. Wipe housing with a clean damp cloth.
Clean P.C. dome/windows with an approved P.C. cleaner.*
3. Verify that all the mounting hardware is secure.
* (plastic polish cleaner)
Vista de página 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 48

Comentários a estes Manuais

Sem comentários